How to assemble teardrop racking?

Spread the love

The process that will be explained is the installation of a standalone bay of teardrop pallet rack. In our example, it will be demonstrated with two people installing the system. This is because, in practice, you always want to have at least two people installing the racking. It will help the installation go more smoothly and lower the risk of injury. To get your racking set up, you should have two frames and at least four cross beams.

Before installation, we recommend marking where each beam will be slotted so there’s no need to worry about the beam being level.

Step 1: Install the Bottom Rear Pallet Rack Beam
Once you have all of your measurements and parts ready, it’s time to begin the installation! To install a standalone bay of selective teardrop pallet rack, you will need your two frames, four beams, as well as wire decks or pallet supports on hand. One person should start by grabbing one of the teardrop upright frames and planting it roughly where it will stay once in use. The first beam to be installed will be the bottom rear beam.

Step 2: Install the Top Rear Pallet Rack Beam
Once the first beam is fully inserted, both individuals can grab the second beam, which will be the top rear beam. This carrier will be installed on top of the originally installed carrier. With a previously determined beam height, people know the hole into which the beam will be inserted. Now that the bay is self-supporting, the two assemblers can work together to attach the upper rear beam to the two frames. Make sure the carrier is securely attached to each frame.

Step 3: Assemble the upper front pallet rack support
After successfully installing the two rear supports, install the two front supports. This process is almost the same as the previous process, but the upper front beam is installed first. Both people need to grab the next bar and insert it at the top level of the front bar. The teardrop assemble should be exactly the same height as the upper rear bar level. Again, make sure on both sides that the beam is fully inserted into both stand frames.

Step 4: Assemble the lower front pallet rack support
This completes the installation of the 4th and last carrier. This procedure is similar to the previous one. Have both people grab the last joist and insert it into the lower front of the shelf. This should be the same beam level as the lower rear beam. Have people on both sides secure the beam to a suitable upright frame.

Step 5: Wire Deck Installation
Now, you have installed your racking, you just need to add your wire decking. You should have 4 wire decks that correctly fit into the size racking that you chose. Two wire decks will fit on each beam level. On two sides of the wire decks, there will be a small lip or overhang. These two areas will fit over the front and back beams.

Step 6: Get started with pallet racking.

teardrop-racking-alongside-a-warehouse

Teardrop pallet racking at Atlanta.

Teardrop racking at South East Rack depot is a company with a dynamic field of construction, warehousing and racking in different service zones. In Atlanta, our firm is one of the best suppliers of teardrop racking. Our preference for feasible design, manufacturing product specification, cost optimization and well served delivery has aided in maintaining our position as the firm with the highest number of teardrop rack supply in Atlanta, GA.